As part of the process of the garment, laundry is a leaching process that produces an effect on the garment to be more comfortable in use, adding value and fashionable. These results caused by machines and chemicals usage factors, depending on the type of the laundry. There are three types of process : Wet, Dry, and Mixed (wet + dry)
1. Wet Process (Immersion)
Is a production process using water and chemicals dissolved in water and then played in the washer machine according to the type of laundry.
TYPE | RESULT |
---|---|
Garment Wash | Handfeel |
Enzym Wash | Abration effect & handfeel |
Enzym Bleach | Abration effect & Reduce colour |
Stone Wash | Abration effect |
Thin ting colour | Colour effect |
Over Dyed | Colour edded |
Daily Capacity | : | 32.500pcs, consists of |
Heavy Wash | : | 7.500pcs |
Light Wash | : | 25.000pcs |
Monthly Capacity (30 day) | : | 845.000pcs, consists of |
Heavy Wash | : | 195.000pcs |
Light Wash | : | 650.000pcs |
- Machine Washer size 450 Lbs | : | 16 unit |
- Machine Washer size 250 Lbs | : | 3 unit |
- Machine Extract size 42 inch | : | 5 unit |
- Machine Dryer size 350 Lbs | : | 20 unit |
- Machine Washer size 60 kg | : | 4 unit |
- Machine Washer size 20 kg | : | 1 unit |
- Machine Washer size 10 kg | : | 4 unit |
- Machine Extract size 20 inch | : | 2 unit |
- Machine Dryer size 250 Lbs | : | 2 unit |
- Stand Manne Queen | : | 13 unit |
- Manne Queen | : | 6 unit |
- Grinding Machine | : | 6 unit |
- Sand Blast Machine | : | 1 unit |
Time to make Sample | : | 4 hours after sample received |
Quotation | : | 24 hours or depend, after sample received by Customer |
Sample Pick Up | : | 1 hour after information come |
Sample Delivery | : | 1 hour after sample process finished |
- 1st Lot Production Pick Up | : | 1 hour after information come |
- 1st Lot Production Delivery | : | 1 hour after 1st lot received |
- Time to make 1st Lot | : | 4 hours after 1st lot received |
- Quality Assurance before Production | : | 100 % tag from 1st lot |
- Quality Assurance after Production | : | 100 % tag from 1st lot |
- Bulk Production Pick Up | : | 1 hour after information come |
- Bulk Production Delivery | : | 1 hour after bulk received |
- Quality Assurance before Production | : | 100 % tag from received |
- Quality Assurance after Production | : | 100 % tag from send |
Phone | : | 0298-522888, ext.2530 |
E-mail address | : | laundrybwn@apacinti.com |
Opening dates and hours – 13th to 15th Oct 2015, (09:00 – 18:00) Venue – National Exhibition and Convention Center (Shanghai), No. 333, Songze Avenue, Shanghai
In Participation Intertextile Shanghai (Shanghai apparel fabrics) show PT Apac will be more focus in promoting Denim fabrics beside Yarns and Greige fabrics.
HELD AT IMPACT MUANG THONG THANI, BANGKOK THAILAND FROM 13 TH AUGUST - 16 TH AUGUST 2009 COORDINATION BETWEEN ASSOCIATION TEXTILE...
Apac Inti Corpora at Texworld Worldwide Textile 'Rendez-vous' on 9th to 12th February 2009 Location : Paris Le Bourget, France Exhibitors : 817 from...